Grenland Bridge, E18 Langangen – Rugtvedt, Norway

Steel structure merging and assembly using the longitudinal launching method of the Grenland Bridge South.

Section scope: TR1 to TR7:

  • Length: 138 m
  • Weight: 778.64 tons